XiCA Heating Film

XiCA Merits

XiCA sublimates the stability of heating films to global standards.

Comparison by installation method

  Section Boiler Film heating by Far infrared Remark
Building Building method Wet type Dry type Easy construction
Boiler room Need some space No need Increased actual space
Heating plumbing Shown outside No Clean
Installed thickness 110~220mm 6mm About 10cm decreased floor height
Building period 4~5day 1day Reduce of building period
Wt./3.3M2 About 240Kg 2kg 238Ton/3,300M2 Wt. Saving
Maintenance Maintenance Need continuous maintenance No need Convenient
A/S Frequent Almost None Safe enough
Frozen/Break Possible to cause None -
Repair of floor Big size construction Small size construction Easy
Expense High(100%) Low(64%) -
Remodeling Very limited Easy -

Comparison by heating method

Section Fuel, Gas Boiler XiCA Heating Film Boiler Electric Panel
Type Fossil fuel Electricity Electricity Electricity
Method Conduction, Convection Radiated Heat Conduction, Convection Conduction
Far infrared None Over 90% None None
Heating Time 30~60Min 4~10Min 30~60Min 15~30Min
Durability About 10 years Semi-permanent About 5 years 2~3years
Weakness - Frozen/Break
-Expensive fuel cost
Need water heater - Possibility of breakdown
within 2 years
- Hard to control
- Heated floor only
- Deformation of panel generating
- large amount of electromagnetic waves

Comparison by heating cost

Section Unit price for supply Monthly usage Heating Cost Heating index
LPG ₩990/kg 130kg ₩128,700 100
Fuel boiler 1,050/L 175L ₩157,500 99
Electric Panel 66.8/Kwh 1,248Kwh ₩83,366 58
XiCA Heating Film 66.8/Kwh 84.0Kwh ₩56,112 32