Installation
Precaution
Heating Film gives customers a better value.
The process of manufacture creates the value of quality.
- ㆍ Before installing, make sure the surface of the construction must be even to prevent the film from bending, and foreign matter must be removed.
- ㆍ Install the Film without water and moisture on the surface, and perfectly removing it if there is any
- ㆍ When installing heating film, do not use glass fiber insulation pad or insulation oad with a rough surface to make sure avoid any damage on the surface of heating film .
- ㆍ Be careful that do not to drop things nor step on the film surface by shoes while working.
- ㆍ Must not use paint, colorant or hardened adhesives as a finished material due to cause of discoloration by direct heat or spilt.
- ㆍ In order to maximize the heating effect of thermal insulation pad and finishing materials, it is necessary to consult with a company specializing in insulation materials and construction engineers depending on the construction site.
- ㆍ When cutting the film, cut so that the length of one side does not exceed the specified power (Watt) value and 80% of the temperature controller capacity.
※ Electric power(Watt) calculation method = V² / R (v = Voltage, R = Resistance)
※ Heating Film installation length and temperature controller capacity
Item |
Current Per ㎡ |
Stright Max length |
4Kw thermostat capacity |
Heating Film |
0.9A |
50Cm*16M |
50Cm*16M*2lines |
80Cm*10M |
80Cm*10M*2lines |
100Cm*8M |
100Cm*8M*2lines |
- ㆍ Other matters related to film installation should be discussed with installation engineers and heat installation companies according to the site conditions.
- ㆍ Considering the external environment, using purpose, and predictable environmental conditions, it is recommended to add about 20% of the calculated calorific value and install it after review.